Not known Details About site acceptance test procedure
Doc any adjustments to your SAT procedure and scope in a revision history, which must be taken care of and referenced through the job.Test the features of approach alarms by triggering predefined alarm problems and verifying their activation around the engineering and operator stations.The site engineering group must be liable for commissioning and